Forum

Please or Register to create posts and topics.

Entrance Signs

Based on the dimensions provided and a total estimated surface area PER SIGN of approximately 113 to 120 square feet, here is a breakdown of the material costs for a stucco renovation.

Surface Area Calculation

  • Middle Section (65 sq. ft.): Front (), Back (), and Top ().

  • End Caps / Pillars (48 sq. ft.): Two pillars, each with three visible full sides, the top, and the small portion of the interior side above the middle wall.

  • Total Estimated Area: (plus 10% for waste = ).

Estimated Material Cost (DIY)

If you are purchasing the materials yourself at a local home improvement store, expect the following costs:

Item Description Estimated Quantity Estimated Cost
Bonding Agent Required to help the new stucco adhere to the old brick. 1 Gallon
Base Coat Scratch & Brown coat (e.g., Quikrete Stucco Mix). 7 – 8 bags ()
Finish Coat Textured finish coat (Gray or White). 1 – 2 bags ()
Fiberglass Mesh For durability and to prevent cracking over the brick. 1 Roll/Bundle
Paint & Sealer Masonry-grade exterior paint and primer. 1 – 2 Gallons
Total DIY Materials

Professional Installation Estimate

If you choose to hire a professional, the cost typically includes labor and materials.

  • Stuccoing over Brick: Generally costs between and per square foot.

  • Total Professional Estimate: Approximately $$1,000 – $1,700.

Project Notes

  • Preparation: Ensure the brick is pressure washed and free of loose debris before applying the bonding agent.

  • Lath vs. Bonding: While a bonding agent is standard for brick-to-stucco, using a metal or fiberglass lath (mesh) is highly recommended for an entrance sign to prevent future cracks caused by vibrations or settling.

  • Signage: You will need to remove the “Holden Park” lettering before starting and likely replace it with new mountings or a placard once the stucco has cured (usually 48–72 hours).

Uploaded files:
  • Gemini_Generated_Image_3eb46v3eb46v3eb4.png